Prompt Details
Model
Chat - (gpt-6.1-sol)
Token size
1,084
Example input
[USER_BRIEF]: Please respond in English. Project: three illustrated portfolio pages. Constraints: private draft only; no purchases or public release. Resources: existing source files, outline, text editor and personal computer; no external approval needed. Concrete 30-day result: complete a private four-section draft with one example per section and self-review completed. Current status: outline and first rough section exist. Time budget and available days: Monday-Friday 60 dedicated project minutes per day after all other duties; weekends unavailable. Start date: 2026-10-06. Fixed unavailable days: weekends only; no other project-time commitments. Known obstacles and dependencies: group sources before section drafting; assemble before self-review; no external approval. Workload limits: no overtime; existing materials only.
Example output
1) Sprint contract
Period: October 6–November 4, 2026, exactly 30 calendar days.
Result: Three illustrated portfolio pages forming a complete private draft with four sections, one example per section, and a completed self-review.
Acceptance criterion: By day 30:
All three pages and four sections are present.
Each section contains one example drawn from existing materials.
The pages contain illustrations prepared from existing materials.
Self-review is documented, with any remaining issues recorded.
The draft remains private.
Non-goals: Purchases, public release, external approval, additional pages or sections, and overtime.
Current status: An outline and the first rough section exist.
Fixed boundaries: Monday–Friday, 60 project minutes daily; weekends unavailable. Use existing source files, outline, text editor, and personal computer.
Open points: Distribution of four sections across three pages; suitability of existing materials for illustrations; current completeness of the rough section. Resolve these during the scheduled work.
Capacity calculation:
Window Available weekdays Minutes
Days 1–7 5 300
Days 8–14 5 300
Days 15–21 5 300
Days 22–28 5 300
Days 29–30 2 120
Total 22 1,320 — 22 hours
The calendar allocates exactly 1,320 minutes. Minimum actions replace part of that day’s allocation; they are never additional work. Feasibility remains an estimate until the source inventory is complete.
2) Four weekly outcomes and closing window
Window One verifiable outcome Dependencies Latest sensible completion
Week 1 Section 1 is complete with its example and mapped illustration material. Sources grouped; acceptance checklist and page allocation established. Day 7, October 12
Week 2 Sections 2 and 3 are complete with one example each. Relevant source groups available. Day 14, October 19
Week 3 All four sections and illustration components are ready for assembly. Section 4 drafted; existing illustration materials usable. Day 21, October 26
Week 4 One assembled three-page private draft is ready for final review. All sections, examples, and illustrations ready. Day 28, November 2
Closing window Final review and bounded rework completed on day 29; acceptance, documentation, and next decision completed on day 30. Assembled draft available. November 3–4
3) Calendar for day 1 to day 30
Each working day has a 60-minute ceiling, including checks and documentation. Review days reserve 10 minutes for the weekly review. Every minimum action below takes 10 minutes.
2026-10-06: Define the acceptance checklist and inventory existing files. Result: Checklist and source inventory saved. Budget: 60 min. Minimum: Save the checklist.
2026-10-07: Group sources by section and identify illustration candidates. Result: Four source groups with gaps recorded. Budget: 60 min. Minimum: Group sources for section 1.
2026-10-08: Allocate four sections across three pages and map examples. Result: Page map with one existing example assigned per section. Budget: 60 min. Minimum: Assign section 1’s example.
2026-10-09: Revise the existing rough section using its grouped sources. Result: Section 1 contains its intended content and example. Budget: 60 min. Minimum: Revise one incomplete passage.
2026-10-10: Rest; no project action. Result: Unavailable day respected. Budget: 0 min. Minimum: None.
2026-10-11: Rest; no project action. Result: Unavailable day respected. Budget: 0 min. Minimum: None.
2026-10-12: Finish section 1 and review week 1. Result: Section 1 checked against the checklist; deviation and next decision recorded. Budget: 60 min. Minimum: Check section 1 and record its next necessary correction.
2026-10-13: Draft section 2 from its source group. Result: Complete rough section 2 saved. Budget: 60 min. Minimum: Draft its first substantive passage.
2026-10-14: Integrate and check section 2’s example. Result: Section 2 complete with one traceable example. Budget: 60 min. Minimum: Add the example and its source reference.
2026-10-15: Draft section 3 from its source group. Result: Complete rough section 3 saved. Budget: 60 min. Minimum: Draft its first substantive passage.
2026-10-16: Integrate and check section 3’s example. Result: Section 3 complete with one traceable example. Budget: 60 min. Minimum: Add the example and its source reference.
2026-10-17: Rest; no project action. Result: Unavailable day respected. Budget: 0 min. Minimum: None.
2026-10-18: Rest; no project action. Result: Unavailable day respected. Budget: 0 min. Minimum: None.
2026-10-19: Check sections 2 and 3 and review week 2. Result: Both sections checked; deviation and next decision recorded. Budget: 60 min. Minimum: Record the most consequential remaining defect.
2026-10-20: Draft section 4 from its source group. Result: Complete rough section 4 saved. Budget: 60 min. Minimum: Draft its first substantive passage.
2026-10-21: Integrate and check section 4’s example. Result: Section 4 complete with one traceable example. Budget: 60 min. Minimum: Add the example and its source reference.
2026-10-22: Prepare existing illustration material for page 1. Result: Page 1 illustration component and accompanying text ready. Budget: 60 min. Minimum: Select its source material and record placement.
2026-10-23: Prepare existing illustration material for pages 2 and 3. Result: Both pages’ illustration components and accompanying text ready. Budget: 60 min. Minimum: Prepare one illustration component.
2026-10-24: Rest; no project action. Result: Unavailable day respected. Budget: 0 min. Minimum: None.
2026-10-25: Rest; no project action. Result: Unavailable day respected. Budget: 0 min. Minimum: None.
2026-10-26: Check assembly readiness and review week 3. Result: Four sections, four examples, and illustration components checked; next decision recorded. Budget: 60 min. Minimum: List any missing assembly prerequisite.
2026-10-27: Assemble page 1 according to the page map. Result: Page 1 includes its assigned content and illustration. Budget: 60 min. Minimum: Insert one prepared component.
2026-10-28: Assemble page 2 according to the page map. Result: Page 2 includes its assigned content and illustration. Budget: 60 min. Minimum: Insert one prepared component.
2026-10-29: Assemble page 3 according to the page map. Result: Page 3 includes its assigned content and illustration. Budget: 60 min. Minimum: Insert one prepared component.
2026-10-30: Check continuity, page allocation, and completeness across the draft. Result: Integrated three-page draft with a prioritized correction list. Budget: 60 min. Minimum: Check one page against the acceptance checklist.
2026-10-31: Rest; no project action. Result: Unavailable day respected. Budget: 0 min. Minimum: None.
2026-11-01: Rest; no project action. Result: Unavailable day respected. Budget: 0 min. Minimum: None.
2026-11-02: Resolve the highest-priority assembly defects and review week 4. Result: Review-ready draft; remaining deviations and closing decision recorded. Budget: 60 min. Minimum: Correct one acceptance-related defect.
2026-11-03: Perform final self-review and bounded rework. Result: Completed self-review record with corrections and remaining issues. Budget: 60 min: 30 review, 30 rework. Minimum: Review one acceptance criterion and record the finding.
2026-11-04: Assess acceptance, document the private draft, and record the next decision. Result: Saved final draft, acceptance record, remaining-issue list, and decision to stop or pursue separate work. Budget: 60 min. Minimum: Record acceptance status and save the current draft.
Mathematical check: 22 working days × 60 minutes + 8 unavailable days × 0 minutes = 1,320 minutes. No weekend work or overtime is planned. Source grouping precedes drafting; assembly precedes self-review.
4) Backlog and restart protocol
One missed day: At the next available session, spend the first 10 minutes comparing completed results with the calendar. Review scope, order, and non-goals. Select the earliest unfinished prerequisite and replace that day’s lower-priority work within its 60-minute ceiling.
Two missed days: Re-estimate the remaining necessary work. Reduce polishing and optional presentation refinements first. Reorder dependent tasks explicitly; do not combine two full sessions into one.
A whole lost week: Recalculate capacity using the actual remaining weekdays. Losing five working sessions removes 300 minutes, leaving at most 1,020 minutes for the sprint. Compare remaining work estimates with remaining capacity.
If required work no longer fits, record the conflict and choose explicitly between:
Simplifying presentation while preserving three illustrated pages, four sections, four examples, and self-review.
Changing the success criterion by an explicit decision.
Recording incomplete acceptance on day 30.
Overtime and weekend recovery remain excluded.
Concrete re-entry step: Open the checklist and latest draft during the next available weekday session. Mark completed results, identify the earliest missing prerequisite, and perform its 10-minute minimum action.
5) Risks and countermeasures
Confirmed constraints and dependencies: Sources must be grouped before drafting; assembly must precede self-review; weekends and overtime are unavailable. No external approval dependency exists. No additional confirmed obstacle was supplied.
Hypothesis Early warning Prevention Reaction
Existing materials may not support an example or illustration. An empty source assignment on day 3. Check suitability during source grouping. Use another suitable existing item; if none exists, record the acceptance conflict and request an explicit scope decision.
Drafting or illustration preparation may exceed its allocation. A scheduled result remains incomplete after 60 minutes. Keep each section focused on its assigned example; stop at the daily ceiling. Simplify treatment and apply the backlog protocol.
Four sections may overcrowd three pages. The assembled draft requires unreadable density or a fourth page. Establish the page map on day 3. Remove repetition and shorten supporting text while retaining all required sections and examples.
6) Tracking and weekly review
Track only these three proofs:
Content completion: Number of complete sections with a checked example, out of four.
Page completion: Number of assembled illustrated pages, out of three.
Acceptance evidence: Checklist status and completed self-review record.
On days 7, 14, 21, and 28, record:
Planned result.
Actually completed result, with its file or draft location.
Verifiable deviation.
Decision for the next week within remaining capacity.
Judge progress by saved, checked results.
7) Start today
Today is October 5; the specified sprint starts October 6. No project time was allocated for today, so no preparation is required before day 1.
First executable step on October 6: Open the outline and source files, save the acceptance checklist, and inventory the existing materials.
Required preparation: Have the existing files accessible in the text editor.
Visible result: A saved checklist and source inventory.
Minimum action for today, only if 10 minutes are available: Save the acceptance checklist. This is optional preparation outside the sprint; tomorrow’s session should use that result rather than repeat it.
By purchasing this prompt, you agree to our terms of service
GPT-6.1-SOL
An exactly 30-day execution plan with acceptance criteria, capacity checks and backlog recovery. Supply a complete brief; the prompt asks for missing required details. Designed for ChatGPT. Review the resulting draft before use.
Estimated saving: 60–120 min/use.
...more
Added 4 days ago
