Prompt Details
Model
(claude-4-8-opus)
Token size
4,950
Example input
[PARTY_DETAILS]: Client: Rajesh Mehta, homeowner, Mumbai Maharashtra India. Contractor: BuildRight Construction Pvt Ltd, Mumbai, license MH-BUILD-4421
[PROJECT_DESCRIPTION]: Complete interior renovation of 3BHK apartment including kitchen remodel, two bathroom renovations, flooring, and painting throughout
[COMMERCIAL_TERMS]: INR 18 lakhs lump sum, 25 percent on signing, 25 percent at structural completion, 25 percent at fit-out completion, 25 percent on handover, 5 percent retention released after 3 months
[TIMELINE_AND_MILESTONES]: Start August 1 2026, kitchen and bathrooms complete by October 1 2026, full practical completion November 30 2026
[LEGAL_PREFERENCES]: Maharashtra India governing law, direct negotiation then arbitration Mumbai, 3 month defects liability period, no liquidated damages
Example output
--------------------------------------------------
DRAFT FOR ATTORNEY REVIEW ONLY
This document is a structured preparation
draft only. It does not constitute legal
advice and must be reviewed and finalized
by a qualified construction law attorney
before it is signed or relied upon by
either party.
--------------------------------------------------
CONSTRUCTION CONTRACT — DRAFT FOR
ATTORNEY REVIEW
Document Ref: CC-2026-001
Date of Preparation: June 1 2026
CLIENT:
Rajesh Mehta
Homeowner
Mumbai Maharashtra India
Email: [client email]
CONTRACTOR:
BuildRight Construction Pvt Ltd
Mumbai Maharashtra India
Contractor License: MH-BUILD-4421
Email: [contractor email]
1. RECITALS
1.1 Rajesh Mehta is the owner of a
residential apartment in Mumbai
Maharashtra India in respect of which
he wishes to commission interior
renovation works.
1.2 BuildRight Construction Pvt Ltd is
a licensed building contractor based
in Mumbai with the experience and
capacity to perform the interior
renovation works described in this
contract.
1.3 Both parties confirm mutual intent to
document the terms of this construction
arrangement through this contract.
2. DEFINITIONS
2.1 Client: Rajesh Mehta.
2.2 Contractor: BuildRight Construction
Pvt Ltd.
2.3 Project: The interior renovation of
the 3BHK apartment as described in
Section 3 of this contract.
2.4 Works: All building and renovation
work described in the agreed Scope of
Work in Section 3.
2.5 Contract Sum: INR 18,00,000 being the
total agreed lump sum for the Works.
2.6 Variation: Any change to the agreed
Scope of Work requested in writing
by either party and confirmed by a
signed variation order.
2.7 Practical Completion: The stage at
which the Works are complete in
accordance with this contract subject
only to minor defects that do not
prevent the Client from using the
apartment.
2.8 Defects Liability Period: 3 months
from the date of practical completion.
2.9 Retention: The amount withheld from
progress payments as described in
Section 8.
2.10 Effective Date: August 1 2026.
3. SCOPE OF WORK
3.1 BuildRight Construction Pvt Ltd will
perform the following works at the
Client's apartment in Mumbai:
1. Complete kitchen remodel including
demolition, tiling, joinery, and
fitting of agreed fixtures.
2. Full renovation of two bathrooms
including demolition, waterproofing,
tiling, and installation of agreed
sanitaryware.
3. Flooring throughout the apartment
including removal of existing
flooring and installation of agreed
replacement flooring.
4. Painting of all internal walls and
ceilings throughout the apartment
in agreed colours and finishes.
3.2 All Works must be performed in a proper
and workmanlike manner in accordance
with applicable building standards.
3.3 Items not included in the Scope of
Work include structural works, external
works, electrical rewiring, and any
works not listed above. Additional
works require a signed variation order.
4. PAYMENT SCHEDULE
4.1 The total Contract Sum is INR 18,00,000
payable as follows:
1. INR 4,50,000 on signing this
contract (25 percent).
2. INR 4,50,000 upon completion of
structural demolition and substrate
preparation for kitchen and
bathrooms (25 percent).
3. INR 4,50,000 upon completion of
tiling, joinery, and fit-out works
(25 percent).
4. INR 4,50,000 upon practical
completion and handover (25
percent).
4.2 Retention of 5 percent will be withheld
from milestone payments 2 and 3 and
released 3 months after practical
completion subject to satisfactory
completion of all notified defects.
4.3 Each payment is due within 7 days of
the relevant milestone being achieved
and confirmed in writing by the
Contractor.
5. TIMELINE AND MILESTONES
5.1 Commencement date: August 1 2026.
5.2 Kitchen and both bathrooms complete:
October 1 2026.
5.3 Practical completion of all Works:
November 30 2026.
5.4 BuildRight Construction Pvt Ltd must
notify Rajesh Mehta promptly if any
milestone is at risk and both parties
must agree any revised program in
writing.
6. VARIATIONS
6.1 No variation to the Works will be
carried out without a signed written
variation order confirming the scope,
agreed price, and time impact.
6.2 Oral instructions to change the Works
do not constitute a valid variation
order.
6.3 The Contractor must submit a variation
quotation within 5 business days of
receiving a written variation request
from the Client.
7. DEFECTS LIABILITY PERIOD
7.1 The Defects Liability Period is 3
months from the date of practical
completion.
7.2 BuildRight Construction Pvt Ltd must
rectify any defect notified during
the Defects Liability Period at their
own cost within 14 days of notification.
7.3 Remaining retention is released upon
expiry of the Defects Liability Period
subject to satisfactory completion of
all notified defects.
8. INSURANCE
8.1 BuildRight Construction Pvt Ltd must
maintain throughout the Works period:
1. Contract works insurance covering
the full value of the Works.
2. Public liability insurance of not
less than INR 1 crore per event.
3. Workmen's compensation insurance
as required by applicable Indian
law.
8.2 Evidence of all insurance policies
must be provided to Rajesh Mehta
before works commence.
9. DISPUTE RESOLUTION AND GOVERNING LAW
9.1 Laws of Maharashtra India govern this
contract.
9.2 Disputes will first be addressed
through direct good-faith negotiation.
If unsuccessful, disputes proceed to
binding arbitration in Mumbai.
SIGNATURE BLOCK:
Note: Both parties must have this contract
reviewed by a qualified construction law
attorney before signing. Applicable
Maharashtra building regulations and
contractor licensing requirements must
be confirmed before works commence.
Rajesh Mehta (Client)
Signature: ________________
Date: ____________________
BuildRight Construction Pvt Ltd
(Contractor)
License No: MH-BUILD-4421
Signature: ________________
Name: ____________________
Title: ___________________
Date: ____________________
--------------------------------------------------
This Construction Contract draft was
generated by an AI drafting tool as a
structured preparation and documentation
aid only. It does not constitute legal
advice. Always have this document reviewed
by a qualified construction law attorney
before either party signs or acts upon it.
--------------------------------------------------
By purchasing this prompt, you agree to our terms of service
CLAUDE-4-8-OPUS
Generate a complete Construction Contract
draft instantly using Claude AI. For
builders, contractors, developers, and
property owners worldwide. Includes scope
of work, payment schedule, variations,
defect liability, retention, insurance,
and dispute sections. Plain English
summary and compliance checklist included.
Preparation aid only. Not legal advice.
...more
Added 1 week ago