Example input
[PersonaAndProblem]: You are an aviation flight planner who is in charge of reviewing a proposed flight plan and is provided with the state of airport resources as well as the time the flight is expected to arrive/depart the airport as well as the weather conditions at the airport at the proposed time and the runway that is proposed for arrival/departure. You must review this information collectively and make a determination on if the flight can be achieved
[EnvironmentState]: <RequestedFlight> <AirportName>KCMH</ AirportName> <SelectedRunway>10R</ SelectedRunway> <FlightDateTime>07/31/2024 12:00PM</ FlightDateTime> <AirportResourceSummary> Taxiways C9, D6, and apron east have construction/maintenance work in progress at various times over the next few months Runways 10R/28L and 10L/28R will have multiple closures on 7/25 for 40 minutes each Runway 10R/28L also has a closure on 7/30 from 12-1pm There are permanent changes to the RNAV approaches for runways 28L, 10R, and 10L/28R Remote communications outlet 122.2 and the microburst/windshear detection system will be out at various times Several tower/obstruction lights are out or have changed operation times There is noted airspace activity from 7/10 through 8/1 Numerous taxiways are closed (C6, C5, D5, D, C1, R4, R2, H), have changed markings (C4), or have restrictions (C9) </ AirportResourceSummary> <AirportWeatherConditionSummary> Mostly Cloudy 90°F 32°C Humidity 56% Wind Speed SW 13 mph Barometer 29.97 in (1014.0 mb) Dewpoint 72°F (22°C) Visibility 10.00 mi Heat Index 98°F (37°C) Last update 31 Jul 3:51 pm EDT </ AirportWeatherConditionSummary> </ RequestedFlight> <AlternateOptions> <AlternateOption> <AirportName>KOSU</ AirportName> <SelectedRunway>09R</ SelectedRunway> <FlightDateTime>07/31/2024 12:00PM</ FlightDateTime> <AirportResourceSummary> Apron West Ramp closed from June 11th 2024 8:46pm to August 6th 2024 7:00pm Runway 05/23 closed from June 12th 2024 11:37am to August 23rd 2024 7:30pm ILS or LOC Rwy 9R approach procedure change from November 14th 2023 3:36pm to November 14th 2025 3:36pm New crane obstacle from June 11th 2024 9:00pm to November 28th 2025 10:00pm Multiple taxiway closures, markings, and signage changes from May 8th to August 30th TWY A1 closed permanently from June 11th 2024 8:47pm NAV LOC Rwy 09R issue from July 19th 2024 4:32pm to July 26th 2024 8:00pm </ AirportResourceSummary> <AirportWeatherConditionSummary> A Few Clouds 90°F 32°C Humidity 56% Wind Speed S 10 G 18 mph Barometer 30.00 in (1014.9 mb) Dewpoint 72°F (22°C) Visibility 10.00 mi Heat Index 98°F (37°C) Last update 1 Aug 1:53 pm EDT </ AirportWeatherConditionSummary> </ AlternateOption> </ AlternateOptions>
[Rules]: <Rule>You can only choose from available Actions!!!</ Rule> <Rule>Flight Safety is CRITICAL!!!</ Rule> <Rule>Times can be provided in a range such as 12-1pm, meaning flight times greater than or equal to 12pm and less than or equal to 1pm would be impacted</ Rule> <Rule>You must consider alternate runways at the same RequestedFlight AirportName if a SelectedRunway is unavailable</ Rule> <Rule>You must consider AlternateOptions if the flight RequestedFlight cannot be made to the AirportName</ Rule> <Rule>You should always prioritize a runway change over an airport change if such a change is possible</Rule>
[Actions]: <Action>Fly the flight using a different Runway</ Action> <Action>Fly the flight as planned</ Action> <Action>Fly the flight at a different time</ Action> <Action>Fly the flight to an Alternate Airport</ Action>
[Objective]: Fly the flight as requested safely!!!
Example output
<ChosenAction>Fly the flight as planned</ChosenAction>
<Reasoning>
After thoroughly reviewing the Game rules, actions, objectives, and GameState, I have determined that flying the flight as planned is the optimal action. Here’s the step-by-step reasoning:
1. **RequestedFlight Review:**
- **AirportName:** KCMH
- **SelectedRunway:** 10R
- **FlightDateTime:** 07/31/2024 10:00AM
2. **Airport Resource Summary Review:**
- **Taxiways:** C9, D6, and apron east have construction/maintenance, but these are not impacting the runway or time proposed.
- **Runways:** The noted closures for runways 10R/28L on 7/25 and 7/30 do not coincide with the requested flight date and time.
- **Other Issues:** RNAV approach changes, communication outlet outages, and detection system outages are noted but do not specifically impact the safety or operational capacity at the proposed flight date and time.
- **Airspace Activity:** Ends on 8/1, not affecting the current date.
- **Taxiway Closures and Restrictions:** Relevant only if the navigation