PromptBase
PromptBase SelectGet Select
Close icon
General
Home
Marketplace
Create
Hire
Login
Chat
Sell
Explore

Prompt Details

Model
(claude-5-sonnet)
Token size
745
Example input
[RETRO_INPUT]: Two-week sprint review, team of five engineers. Inputs from each: Shipped the new pricing page on schedule, felt good. Spent way too much time on the Stripe integration, why does Stripe documentation lie? The migration tooling broke twice, lost a day, same kind of breakage we had three months ago. I couldn't tell what was actually the priority this sprint, felt like everything was urgent. Pair-debugging session with Jamie was great, but I had to schedule it three days out because we're never online at the same time. I'm tired.
Example output
**Period under review:** Two-week sprint covering the new pricing page launch and the Stripe integration work. **What worked:** - New pricing page shipped on schedule. The team executed on the visible deliverable. - Pair-debugging session (Jamie + teammate) produced a result. Pairing across timezones is hard but works when it happens. **What didn't work:** - Stripe integration consumed more time than planned, partly due to documentation gaps. The team didn't have a way to spike this in advance to discover the gaps before they were on the critical path. - Migration tooling broke twice during the sprint, the same kind of breakage that happened three months ago. The earlier fix didn't generalize. - Priorities were unclear within the sprint. At least one engineer didn't know what to work on when ambiguity arose. - One engineer is reporting fatigue. May be sprint-specific; may be a longer pattern. Worth checking individually. **Patterns I notice across the inputs:** - Two of the five inputs touch on time loss from infrastructure that should be handled (migration tooling, Stripe integration friction). The team is spending real time on plumbing that the team has hit before. This isn't a one-sprint issue. - The "I couldn't tell the priority" and "I'm tired" reports both point to a sustainable-pace question. Not necessarily related, but worth holding side-by-side. Unclear priorities tend to produce overwork because everyone tries to cover everything. - Cross-timezone collaboration is working but expensive (three days to schedule a pairing session for an active problem). **Recurring issues (vs. previous retros, if known):** - Migration tooling breaking is explicitly called out as the same issue from three months ago. This is the third sprint in a row where infrastructure friction has come up, based on the team's pattern. Specific recurring lesson: the team has been treating these as one-off losses, not as a systemic issue. **What to actually change:** - **Investigate the migration tooling failure mode root cause this sprint.** Not patching it; understanding why the same class of failure keeps surfacing. Owner: rotates to the engineer who lost time to it this sprint. Definition of done: an ADR or postmortem covering the recurring pattern, plus a fix proposal that addresses the class of failure. - **Add a 15-minute priority sync at sprint start.** Goal: every engineer can name the top three deliverables in priority order by the end of the meeting. Owner: tech lead (or whoever runs sprint planning). Run for two sprints, then evaluate. - **Create a "spike" budget for unfamiliar third-party integrations.** When the team takes on a new integration (Stripe was this sprint's), spend the first half-day exploring undocumented edges before committing the integration to the sprint plan. Owner: whoever proposes the integration; standard practice going forward. **What we're choosing not to change:** - Cross-timezone pairing latency. The team is distributed; some delay between scheduling and pairing is intrinsic. If the delay grows past three days routinely, revisit then. **Things to revisit next retro:** - Did the priority sync help? Are engineers reporting clarity on priorities by the end of the meeting? - Did the migration tooling investigation produce a fix that holds, or is the failure recurring again? - The fatigue report. Should be raised privately with the engineer first, but the team-level question of pace should come back next retro.
Claude

Retro Facilitator

Add to Cart
PromptBase Select
Get this prompt + 9 more with Select$14 your first month, then $19/mo$14 first month, then $19/mo
View Select
Instant accessInstant access
Usage rightsCommercial use
Money-back guaranteeMoney‑back
By purchasing this prompt, you agree to our terms of service
CLAUDE-5-SONNET
Tested icon
Guide icon
4 examples icon
Free credits icon
Turns raw retro input — bullets, a transcript, notes — into a retro that produces change, not a feel-good "what went well" list. Finds patterns across inputs that look like separate complaints but aren't, flags issues recurring from prior retros, and gives specific actions with an owner and a done-state instead of "improve communication." Names what the team's choosing not to fix, and won't sand off rough edges when multiple people flag the same thing. One of 40 in the Pemway Power User Pack.
...more
Added over 1 month ago
Report
Browse Marketplace